1. Alwi, S.
,
Hampson, K.
and
Mohamed, S.
(2002), “Non-value adding activities: a comparative study of Indonesian and Australian construction projects”, Proceedings of the 10th Annual Conference on Lean Construction, Gramado, 12pp.
2. Ashford, J.L.
(1992), The Management of Quality in Construction, E & FN Spon, London.
3. Barber, P.
,
Sheath, D.
,
Tomkins, C.
and
Graves, A.
(2000), “The cost of quality failures in major civil engineering projects”, International Journal of Quality Reliability Management, Vol. 17 Nos 4/5, pp. 479-492.
4. Burati, J.L.
,
Farrington, J.J.
and
Ledbetter, W.B.
(1992), “Causes of quality deviations in design and construction”, Journal of Construction Engineering and Management, Vol. 118 No. 1, pp. 34-49.
5. CIDA
(1995), Measuring up or Muddling Through: Best Practice in the Australian Non-Residential Construction Industry, Construction Industry Development Agency, Sydney.