Causal ascription of rework in building and civil engineering projects

Author:

Ekambaram Palaneeswaran,E.D. Love Peter,M. Kumaraswamy Mohan,S.T. Ng Thomas

Abstract

Purpose – Rework is an endemic problem in construction projects and has been identified as being a significant factor contributing cost and schedule overruns. Causal ascription is necessary to obtain knowledge about the underlying nature of rework so that appropriate prevention mechanisms can be put in place. The paper aims to discuss these issues. Design/methodology/approach – Using a supervised questionnaire survey and case-study interviews, data from 112 building and engineering projects about the sources and causes of rework in projects were obtained. A multivariate exploration was conducted to examine the underlying relationships between rework variables. Findings – The analysis revealed that there was a significant difference between rework causes for building and civil engineering projects. The set of associations explored in the analyses will be useful to develop a generic causal model to examine the quantitative impact of rework on project performance so that appropriate prevention strategies can be identified and developed. Research limitations/implications – The limitations include: small data set (112 projects), which include 75 from building and 37 from civil engineering projects. Practical implications – Meaningful insights into the rework occurrences in construction projects will pave pathways for rational mitigation and effective management measures. Originality/value – To date there has been limited empirical research that has sought to determine the causal ascription of rework, particularly in Hong Kong.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference28 articles.

1. Alwi, S. , Hampson, K. and Mohamed, S. (2002), “Non-value adding activities: a comparative study of Indonesian and Australian construction projects”, Proceedings of the 10th Annual Conference on Lean Construction, Gramado, 12pp.

2. Ashford, J.L. (1992), The Management of Quality in Construction, E & FN Spon, London.

3. Barber, P. , Sheath, D. , Tomkins, C. and Graves, A. (2000), “The cost of quality failures in major civil engineering projects”, International Journal of Quality Reliability Management, Vol. 17 Nos 4/5, pp. 479-492.

4. Burati, J.L. , Farrington, J.J. and Ledbetter, W.B. (1992), “Causes of quality deviations in design and construction”, Journal of Construction Engineering and Management, Vol. 118 No. 1, pp. 34-49.

5. CIDA (1995), Measuring up or Muddling Through: Best Practice in the Australian Non-Residential Construction Industry, Construction Industry Development Agency, Sydney.

Cited by 14 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3