Abstract
PurposeThe site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary facilities such as tower cranes and areas on the jobsite for materials storage. This study proposes an approach to optimizing the type and location of the tower crane and material supply point on construction sites.Design/methodology/approachThe problem is formulated into an integer linear programming (ILP) model considering the total cost of material transportation as the objective function and site conditions as constraints. The efficacy of the approach is demonstrated by finding the optimum site layout for a numerical example. The proposed model is validated and verified using two methods.FindingsResults indicate that the proposed model successfully identifies the type and location of the tower crane and the location of material supply point, leading to approximately 20% cost reduction compared with when such features of a site layout are decided solely based on experience and educated guesses of the construction manager.Originality/valueThe primary contribution of this study is to present a modified linear mathematical model for site layout optimization that exhibits improved performance compared with previous models. The type and location of the tower crane and the material supply point as decision variables are extracted directly from solving the proposed model. The proposed model will help enhance time and cost efficiency on construction sites.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference39 articles.
1. GA optimization model for solving tower crane location problem in construction sites;Alexandria Engineering Journal,2015
2. Crane overlap and operational flexibility: balancing utilization, duration, and safety;Construction Innovation,2018
3. A new model for optimizing the location of cranes and construction facilities using genetic algorithms,2005
4. BIM-based applications of metaheuristic algorithms to support the decision-making process: uses in the planning of construction site layout;Procedia Engineering,2017
5. Mixed-integer programming models for tower crane selection and positioning with respect to mutual interference;Automation in Construction,2019
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献