1. Scheduling/Cost Optimization and Neural Dynamics Model for Construction
2. Barbero, J.I. and Gutierrez, T. (1998), “Haptic virtual prototypes for assembly simultion”, ISATA Magazine, December, pp. 26‐8.
3. A Parametrics Architecture for Design, Management, and Coordination in a Collaborative AEC Environment
4. ISATA Magazine (1998a), “Ford gets dramatic results with C3P”, December, p. 11.
5. ISATA Magazine (1998b), “Intelligent brake cuts stopping time”, December, p. 7.