Abstract
Spare-part management has a significant effect on the productivity of mining equipment. The required number of spare parts can be estimated using failure and repair data collected under the name of reliability data. In the mining industry, failure and repair times are decided by the operational environment, rock properties, and the technical and functional behavior of the system. These conditions are heterogeneous and may change significantly from time to time. Such heterogeneity can change equipment’s reliability performance and, consequently, the required number of spare parts. Hence, it is necessary for effective spare-part planning to check the heterogeneity among the reliability data. After that, if needed, such heterogeneity should be modeled using an adequate statistical model. Heterogeneity can be categorized into observed and unobserved caused by risk factors. Most spare-part estimation studies ignore the effect of heterogeneity, which can lead to unrealistic estimations. In this study, we introduce the application of a frailty model for modeling the effect of observed and unobserved risk factors on the required number of spare parts for mining equipment. Studies indicate that ignoring the effect of unobservable risk factors can cause a significant bias in estimation.
Publisher
Public Library of Science (PLoS)
Reference38 articles.
1. Conceptual approach for integrating condition monitoring information and spare parts forecasting methods;B Hellingrath;Production & Manufacturing Research,2014
2. A stochastic model for joint spare parts inventory and planned maintenance optimisation;W Wang;European Journal of Operational Research,2012
3. Criticality classification of spare parts: A case study;A Molenaers;International Journal of Production Economics,2012
4. Reliability and Spare Parts Provision Considering Operational Environment: A Case Study;A Barabadi;International Journal of Performability Engineering,2012
5. Application of reliability models with covariates in spare part prediction and optimization–a case study;A Barabadi;Reliability Engineering & System Safety,2014
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献