Research on the factors of extremely short construction period under the sufficient resources based on Grey-DEMATEL-ISM

Author:

Peng Junlong,Peng ChaoORCID,Wang Mengyao,Hu Ke,Wu Dubin

Abstract

Under the condition of sufficient resources, there are many factors affecting the realization of extremely short construction period of engineering construction projects. Based on literature review and questionnaire survey, this paper firstly selected 17 influencing factors from the five dimensions of design, management, technology, policy and environment. And the factor analytic hierarchy process model was established based on Grey-DEMATEL-ISM. The model introduced the improved grey system theory and combined decision-making trial and evaluation laboratory (DEMATEL) with interpretative structural modeling method (ISM). In addition, the model can not only identify the critical factors in the system, but also present the internal logical relationship between the influencing factors through the multi-level hierarchical structure diagram. Finally, through the analysis of the influencing factors of extremely short construction period under the sufficient resources, it defined that the key factor is the natural environment and second is the structure type. The methodology implemented in this paper helps decision makers and managers of construction projects to understand the interrelationship and degree of influence among factors affecting the duration under the condition of sufficient resources, to effectively grasp key factors, and to effectively achieve project success.

Funder

Natural Science Foundation of Hunan Province

Publisher

Public Library of Science (PLoS)

Subject

Multidisciplinary

Reference72 articles.

1. Duration and Cost Variability of Construction Activities: An Empirical Study;P. Ballesteros-Perez;Journal of Construction Engineering and Management,2020

2. Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations;N. y. S. Kurchenko;Proceedings of Moscow State University of Civil Engineering,2016

3. MINIMIZATION OF DIRECT COSTS IN THE CONSTRUCTION OF TORRENT CONTROL STRUCTURES;N. Dragovic;Tehnicki Vjesnik-Technical Gazette,2017

4. Multiobjective Construction Optimization Model Based on Quantum Genetic Algorithm;W. He;Advances in Civil Engineering,2019

5. Resource-Based Quality Performance Estimation Method for Construction Operations;Y. J. Park;Applied Sciences-Basel,2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3