Study on stress and deformation characteristics of existing-new two-stage cantilever retaining wall

Author:

Ma XueningORCID,Liu Yuhang,Hao Zixiang,Wang Xu,Yang Youhai

Abstract

A two-stage cantilever retaining wall is composed of two single-stage cantilever retaining walls, which are stacked up and down. The structure not only has the advantages of a single-stage retaining wall, but also compensates for the shortcomings of the height limit of the single-stage retaining wall; therefore, it has been gradually applied in projects. Based on the actual project of Zhongwei-Lanzhou Passenger Dedicated Line into Lanzhou Hub, this paper studies the influence of the construction of new cantilever retaining wall and the filling of subgrade on the deformation and earth pressure of the new cantilever wall and the existing cantilever wall by means of field test and numerical simulation. The results show that with an increase in the filling height after the new cantilever wall (upper wall), the horizontal displacement of the top of the upper and lower walls increased nonlinearly. The displacement direction of the upper wall was the filling direction, and that of the lower wall was the deviation from the filling direction. The higher the filling height, the greater is the displacement. With an increase in the filling height, the earth pressure behind the upper wall increases gradually along the wall height and decreases slightly to the bottom of the wall, which is approximately a linear distribution. The earth pressure behind the existing cantilever wall first increases along the wall height and gradually decreases after reaching a certain depth, but the earth pressure of the lower wall does not increase significantly with an increase in the filling height behind the upper wall. The slope failure mode is the overall sliding failure of the retaining wall together with the fill soil. The sliding surface passed through the lower edge of the lower wall heel and was similar to an arc shape. The stability of the two-stage cantilever retaining wall was better than that of a single-stage retaining wall. Finally, a calculation method for the overall stability and earth pressure of the existing two-stage cantilever retaining wall was proposed.

Funder

key research and development projects of China Railway Lanzhou Group Co.,Ltd

oung Scholars Science and Technology Development Program of Gansu Province, China

Special Funds for Guiding Local Scientific and Technological Development by The Central Government

Publisher

Public Library of Science (PLoS)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3