Record keeping for contemporaneous delay analysis: a model for effective event management

Author:

Carmichael Stuart,Murray Maria

Publisher

Informa UK Limited

Subject

Industrial and Manufacturing Engineering,Building and Construction,Management Information Systems

Reference23 articles.

1. Computer aided construction delay analysis and claims preparation

2. Bechtel National Inc. 1990. NASABCA no 1186–7, 90 BCA (Board of Contracts Appeals Decisions) para 22, 549

3. Black, M. and Caletka, A. 2002. Wantage, UK: Society of Construction Law. A report of the SCL Lecture given by Michael Black, QC, and Anthony Caletka, 10 Oct. 2002, at 2 Temple Gardens

4. Carnell, N. J. 2000.Causation and Delay in Construction Disputes, 89–90. Oxford: Blackwell Science.

Cited by 20 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. BIM-Enabled Claims Management Concept: Implications for Dispute Avoidance and Management;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-08

2. Claims management: a review of challenges faced;International Journal of Construction Management;2024-01-09

3. Understanding Causes for Construction Claims in Hydropower Projects;Journal of Management in Engineering;2023-09

4. Framework for the Application of Blockchain Technology to Delay Analysis;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2023-05

5. Closing the information gaps: a systematic review of research on delay and disruption claims;Construction Innovation;2022-11-21

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3