1. Anglian Water (2017) Water industry cost modelling: Anglian Water’s approach and initial results, September
2. Anglian Water (2019a) PR19 draft determination representation, August
3. Anglian Water (2019b) PR19 draft determinations: deep dive on growth expenditure, August
4. Anglian Water (2020) PR19 CMA redetermination statement of case, April
5. ARERA (2019a) Water tariff method for the third regulatory period (MTI-3): consultation document 402/2019/R/IDR, October