Author:
Sahithi V. V. D.,Rao C. S. P.,Srinivasa Rao M.
Reference25 articles.
1. Harris FW (1913) How many parts to make at once. Mag Manage 10:135–136
2. Wagner HM, Whitin TM (1958) Dynamic version of the economic lot size mode. Manage Sci 5(1):89–96
3. Clark AJ (ed) (1958) U.S. airforce, project rand, research memorandum. ASTIA document number AD 209538
4. DeMatteis JJ (ed) (1968) An economic lot-sizing technique: the part-period algorithm. IBM Syst I 7:30–38
5. Zangwill WI (ed) (1969) A backlogging model and a multi-echelon model of a dynamic economic lot size production system-a network approach. Manage Sci 15(9):506–527. JSTOR. https://www.jstor.org/stable/2628386