1. Ahn, Y. J., Lee, H. S., Park, J. H., and Shin, Y. S. (2006). “Life cycle cost optimization considering maintenance history of bridge deck and girders.” Proc. 3rd Int. Conf. on Bridge Maintenance, Safety and Management, IABMAS, Porto, Portugal, pp. 91–92.
2. Berthelot, C. F., Sparks, G. A., Blomme, T., Kajner, L., and Nickeson, M. (1996). “Mechanistic probabilistic vehicle operating cost model.” J. Transportation Engineering, ASCE, Vol. 122, No. 5, pp. 337–341.
3. De Brito, J. and Branco, F. A. (1995). “Bridge management policy using cost analysis.” Proc. Institution of Civil Engineers, Structures and Buildings, pp. 431–439.
4. Frangopol, D. M., Lin, K. Y., and Estes, A. C. (1997). “Life-cycle cost design of deterioration structures.” J. Structural Engineering, ASCE, Vol. 123, No. 10, pp. 1390–1401.
5. Haldar, A. and Mahadevan, S. (2000). Probability, reliability and statistical methods in engineering design, John Wiley & Sons, Inc.