Publisher
Springer Science and Business Media LLC
Reference28 articles.
1. Aktürk MS, Atamtürk A, Gürel S (2009) A strong conic quadratic reformulation for machine-job assignment with controllable processing times. Oper Res Lett 37(3):187–191
2. Alizadeh F, Goldfarb D (2003) Second-order cone programming. Math Program 95:3–51
3. Aneja Y, Kamoun H (1999) Scheduling of parts and robot activities in a two machine robotic cell. Comput Oper Res 26(4):297–312
4. Barnett N, Costenaro D, Rohmund I (2017) Direct and indirect impacts of robots on future electricity load. In: ACEEE summer study on energy efficiency in industry. The American Council for an Energy-Efficient Economy (ACEEE), pp 1–9
5. Błażewicz J, Sethi SP, Sriskandarajah C (1989) Scheduling of robot moves and parts in a robotic cell. École des hautes études commerciales
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献