1. Harris, F.W.: How many parts to make at once. Fact. Mag. Manag. 10, 135–136 (1913). ([152, Reprinted in Operations Research, 1990, 38(6), 947-950.])
2. Simchi-Levi, D., Kaminsky, P., Simchi-Levi, E.: Designing and Managing the Supplychain: Concepts, Strategies, And Case Studies, p. 1. McGraw-Hill, New York (2003)
3. Goyal, S.K.: An integrated inventory model for a single supplier single customer problem. Int. J. Prod. Res. 15, 107–0111 (1976)
4. Jauhari, W.A.: A collaborative inventory model for vendor–buyer system with stochastic demand, defective items and carbon emission cost. Int. J. Logist. Syst. Manag. 29, 241–265 (2018)
5. Wangsa, I.D., Wee, H.M.: A vendor–buyer inventory model for defective items with errors in inspections, stochastic lead time and freight cost. INFOR Inf. Syst. Oper. Res. (2019). https://doi.org/10.1080/03155986.2019.1607807