Author:
Wang Fuming,Li Bin,Fang Hongyuan,Yu Wei,Zhai Kejie,Hu Benyue
Abstract
AbstractBuried prestressed concrete cylinder pipes (PCCPs) are subjected to the combined effects of soil cover loads, internal water pressure, and additional loads. However, there is scarce research on their mechanical performance under complex service conditions after being buried. In this study, 3D nonlinear finite element (FE) models of PCCPs and soils, along with fluid models, were developed using ABAQUS and FLUENT, respectively. Fluid–solid coupling numerical simulations of PCCPs with broken wires under complex service conditions were conducted using the MpCCI platform. The study focused on investigating the mechanical behaviors of PCCP pipes with broken wires, aiming to determine the effects of different numbers and locations of broken wires, as well as the magnitude of operating water pressure. The results shows that the number of broken wires is a crucial factor affecting the mechanical behaviors of the PCCPs; the dynamic variation of internal pressure within the pipe can cause further damage to PCCPs with pre-existing defects; when wire breakage occurs alone the springline of the PCCPs, the outer concrete core exhibited a tendency to crack before the inner concrete core. Conversely, when wire breaks occurred at the crown and invert, the inner concrete core cracked before the outer concrete core. These results provide valuable insights into the behavior of PCCPs under complex conditions and contribute to the understanding of their structural integrity. The findings can aid in the development of improved design and maintenance strategies for PCCPs, ensuring their reliable performance in underground applications.
Funder
National Key R & D Program of China
National Natural Science Foundation of China
Postdoctoral Science Foundation of China
Youth Talent Promotion Project of Henan Province
Key Specialized Research and Development Breakthrough in Henan Province
Publisher
Springer Science and Business Media LLC
Reference32 articles.
1. Beijing Water Resources Planning and Design Institute (2015) SL702-2015 (2015) Technical specifications of prestressed concrete cylinder pipe. China Water & Power Press, Beijing, China
2. Xu W, Wang W (2017) Integrity inspection of prestressed wire and structural evaluation of PCCP in Zhundong water supply project. Special Struct 34(2):113–115. (in Chinese)
3. Li B, Fang HY, Zhai KJ, Yang KJ, Zhang XJ, Wang YK (2022) Mechanical behavior of concrete pipes with erosion voids and the effectiveness evaluation of the polyurethane grouting. Tunn Undergr Space Technol 129:104672
4. Tremblay AW (1990) Combind load testing of prestressed concrete cylinder pipe. In: Pipeline Design and Installation. ASCE, Reston
5. Zarghamee MS (2003) Hydrostatic pressure testing of prestressed concretrt cylinder pipe with broken wires. In: Najafi M