Author:
Beheshtifar Kosar,Poursorkhabi Ramin Vafaei
Publisher
Springer Science and Business Media LLC
Reference48 articles.
1. Alami MT, Vafaei Poursorkhabi R, Naseri A, Mojtahedi A (2022) Enhancing stability and reduce damage in rubble-mound reshaping breakwaters by using obstacles in front of the structure. Civil Infrastruct Res 7(2):33–49. https://doi.org/10.22091/CER.2021.7367.1297
2. Ambühl S, Ferri F, Kofoed JP, Sørensen JD (2015) Fatigue reliability and calibration of fatigue design factors of wave energy converters. Int J Mar Energy 10:17–38. https://doi.org/10.1016/j.ijome.2015.01.004
3. American Petroleum Institute (2000) RP2A-WSD recommended practice for planning, designing, and constructing fixed offshore platforms. American Petroleum Institute, Washington
4. Asgarian B, Gholami H, Asil Gharebaghi S (2018) A probabilistic model for uniform corrosion in offshore steel structures in Persian Gulf. Mar Eng 13:59–70
5. Bai Y, Yan HB, Cao Y, Kim Y, Yang Y, Jiang H (2016) Time-dependent reliability assessment of offshore jacket platforms. Ships Offshore Struct 11:591–602. https://doi.org/10.1080/17445302.2015.1038869