1. Abdellah W, Raju GD, Mitri HS, Thibodeau D (2014) Stability of underground mine development intersections during the life of a mine plan. Int J Rock Mech Min Sci 72:173–181
2. ANSYS Workbench User’s Manual. Version 17.0. Pennsylvania. United States
3. Bakhtavar E, Oraee K, Shahriar K, (2010) Determination of the optimum crown pillar thickness between open-pit and block caving. In: 29th international conference on ground control in mining. West Virginia University. Morgantown
4. Benardos AG, Kaliampakos DC (2004) Modelling TBM performance with artificial neural networks. Tunn Undergr Space Technol 19:597–605
5. Bewick RP, Kaiser PK (2009) Numerical assessment of factor B in Mathews’ method for open stope design. In: Proceedings of the 3rd CANUS rock mechanics symposium. Canadian Rock Mechanics Association. Toronto, ON