Author:
Aghababaei Sajjad,Jalalifar Hossein,Saeedi Gholamreza
Publisher
Springer Science and Business Media LLC
Subject
Energy Engineering and Power Technology,Geotechnical Engineering and Engineering Geology
Reference13 articles.
1. Adam Consulting engineers (2005) Central mine design. Tabas Coal Mine, Iran
2. Aghababaei S, Saeedi G, Jalalifar H (2015) Risk analysis and prediction of floor failure mechanisms at longwall face in parvadeh-I coal mine using rock engineering system (RES). Int J Rock Mech Rock Eng.
https://doi.org/10.1007/s00603-015-0884-x
3. Bahri Najafi A, Saeedi G, Ebrahimi Farsangi MA (2014) Risk analysis and prediction of out-of-seam dilution in longwall mining. Int J Rock MechSci 70:115–122
4. Benardos AG, Kaliampakos DC (2004) A methodology for assessing geotechnical hazards for TBM tunneling-illustrated by the Athens Metro, Greece. Int J Rock Mech Min Sci 41:987–999
5. IRASCO, IRITEC, Cementation SKANSKA (2005a) Basic design report. Appendix A, rating of rock exposures & Appendix G, geotechnical data. Parvadeh, Tabas Coal Mine Project, Iran
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献