1. Abbasi, A. A. (2012). Field study and provide new relationship for determining the slope of the check-dams. Iranian Journal of Watershed Management Science and Engineering, 19(3), 23–32.
2. Abbasi, M., Mohseni, M. S., Kheirkhah, M. M., Rostamizad, G., & Hosseini, M. (2010). Assessment of watershed management activities on time of concentration and curve number using HEC-HMS model (case study: Kan watershed, Tehran). Journal of Range and Watershed Management, 63(3), 375–385.
3. Ahmadi, H., Nazari, A. A., Ghoddousi, J., & Ekhtesasi, M. R. (2004). A model for evaluation of watershed management projects. Iranian Journal of Natural Resources, 56(4), 337–349.
4. Ahmadi, H., Taheri, S., Feiznia, S., & Azarnivand, H. (2011). Runoff and sediment yield modeling using WEPP in a semi-arid environment (case study: Orazan Watershed). Journal of Desert, 16(4), 5–12.
5. Amiri, F. (2010). Estimate of erosion and sedimentation in semi-arid basin using empirical model of erosion potential within a Geographic Information System (GIS). Journal of Air, Soil and Water Research, 3, 37–44.